
Industries
One System. Every Trade.
THE FOREMAN configures to your exact trade — the workflows, terminology, codes, and documentation your shop runs on. Roofing isn't plumbing. Electrical isn't HVAC. THE FOREMAN gets that. Here's how it works for every trade on the jobsite.
Roofing
THE FOREMAN pulls roofing-specific material pricing, slope factors, underlayment specs, and local wind/hail code requirements into every estimate. It knows comp vs. metal vs. flat vs. tile — and writes proposals that close.
- Shingle, metal, flat, tile roofing
- Tear-off & overlay scoping
- Ventilation & flashing auto-detected
Plumbing
From service calls to new-construction rough-ins, THE FOREMAN builds estimates with UPC/IPC code references, fixture counts, and material takeoffs that account for your supply-house pricing. Stop hand-writing bid after bid.
- Service & new construction
- Code-referenced estimates
- Fixture & rough-in takeoffs
Electrical
NEC-referenced load calcs, panel schedules, and circuit takeoffs — THE FOREMAN handles the math so your estimators don't spend hours on spreadsheets. Service upgrades, new builds, commercial TI — covered.
- NEC code references
- Load calculations
- Panel & circuit schedules
HVAC
Manual J load calcs, duct design specs, equipment sizing, and SEER compliance — THE FOREMAN builds proposals that show the customer exactly what they're getting and why it's sized right. Change-outs and new installs.
- Manual J load calculations
- Equipment sizing & specs
- Duct design integration
General Contracting
Multi-trade coordination, sub bids, material lead times, and phased schedules — THE FOREMAN keeps the whole project organized so you spend less time on paperwork and more time keeping subs on track.
- Multi-trade coordination
- Sub bid management
- Phased scheduling
Concrete & Masonry
Yardage calcs, formwork estimates, rebar schedules, and finishing specs — THE FOREMAN turns a foundation plan into a line-itemed estimate faster than you can mix a yard. Flatwork, foundations, retaining walls.
- Yardage & material calcs
- Formwork & rebar schedules
- ACI spec references
Landscaping & Hardscape
Plant counts, hardscape material takeoffs, irrigation specs, and seasonal maintenance schedules — THE FOREMAN handles the estimating so your designers and crews stay outside. Design-build to maintenance.
- Plant & material takeoffs
- Irrigation system specs
- Seasonal maintenance plans
Painting
Square-footage calcs, surface-prep estimates, coating specs, and labor factoring by surface type — THE FOREMAN builds painting proposals that account for every room, every surface, and every coat. Residential and commercial.
- SF-based estimating
- Surface-prep factoring
- Multi-coat specifications
Flooring
Material-yield calculations, underlayment specs, pattern-matching waste factors, and installation labor by flooring type — THE FOREMAN's estimates are tight enough to win the job and protect the margin.
- Material yield calcs
- Pattern waste factoring
- Installation labor by type
Solar
System sizing, panel layout, production estimates, and interconnection paperwork — THE FOREMAN builds proposals that show homeowners the numbers that matter. Roof-mount, ground-mount, battery storage included.
- System sizing & layout
- Production estimates
- Interconnection paperwork
Carpentry
Board-foot takeoffs, hardware schedules, and finish specs — THE FOREMAN handles rough and finish carpentry estimates so your bids are accurate and your crews know what's on the truck. Framing to trim.
- Board-foot & material takeoffs
- Hardware schedules
- Rough & finish scoping
Drywall
Sheet counts, joint-compound estimates, finish-level specifications, and labor factors by ceiling height — THE FOREMAN builds drywall estimates that don't come up short. Hang, tape, texture — covered.
- Sheet count & layout
- Finish level specs
- Labor by height & complexity
Heavy Civil
Earthwork quantities, utility runs, stormwater calcs, and DOT spec references — THE FOREMAN scales to the heavy side. Site work, underground, paving, and infrastructure estimating with the same send-ready output.
- Earthwork & cut/fill
- Utility takeoffs
- DOT & municipal specs
Demolition
Scope definition, waste-bin estimates, hazmat flagging, and disposal-fee calculation — THE FOREMAN writes demo bids that account for everything before the first swing. Selective demo to full teardown.
- Scope & waste estimates
- Hazmat flagging
- Disposal & tipping fees
Don't see your trade? If you swing a hammer, run a crew, and deal with paperwork, THE FOREMAN works for you. We configure per shop — not per template.
Get My Free Audit